Click on the thumbnails to enlarge the pictures. Use your
browser back button to return to this page.
These are the pictures taken after we restarted work in the new
facility. Some of the work was actually accomplished prior to the move.
|
|
|
Perfect access for cleaning and repair |
|
|
|
More parts must be removed to gain complete access to the spar |
|
|
|
|
Forward fuel tank bulkhead removed for better access |
|
|
|
|
Left Firewall removed and ready for overhaul |
|
|
|
Firewall ready to remove |
|
|
|
Firewall removed |
|
|
|
|
|
Starting to remove everything else behind the firewall |
|
|
|
There are lots of small hard to get to parts |
|
|
|
AND lots of rivets to remove |
|
|
|
|
|
|
|
The process of cleaning and stripping the spar begins |
|
|
|
Rust can be seen on the top of the spar |
|
|
|
|
With everything removed the rust becomes apparent |
|
|
|
All the rust found has been minor surface rust |
|
|
|
|
This landing gear cluster had seen a previous repair in teh 60's. |
|
|
|
|
The welds were very bad and will be removed and repaired. |
|
|
|
The gussets are not correct per Beech drawings |
|
|
|
Beech has full instructions on how to repair this area correctly. |
|
|
|
A new x brace was installed due to corrosion |
|
|
|
|
The tail area was prepared, primed and painted and needs one more top coat |
|
|
|
Center console was removed to provide better access to under floor tubing |
|
|
|
This skin will be replaced due to sand blast damage |
|
|